Thanks Thanks:  0
Showing results 1 to 7 of 7

Thread: (IOS)Intelligent Optimisation Service_Moto..

  1. #1
    VIP Member Reputation: 1478
    Join Date
    2011-01-01
    Location
    Earth
    Posts
    652


    Default (IOS)Intelligent Optimisation Service_Moto..

    Intelligent Optimisation Service

    Vendor:Moto...
    Network:GSM

    Intro:
    This document describes the processes and time cycles for all work
    required during the deployment of the IOS Trial in the OPERATOR network in
    COUNTRY.
    The document provides the scope of works for the trial of the Intelligent
    Optimization Service at the Operator Network. The trial region is to be defined later together with OPERATOR.

    Content:

    1 Introduction: 4
    2 The Intelligent Optimization Service(IOS) 5
    2.1 DATA COLLECTION AND TRANSPORTATION: 5
    2.2 IOS ANALYSIS PLATFORM: 6
    2.3 THE KEY DELIVERABLES OF IOS: 6
    2.3.1 Neighbor Topology: 6
    2.3.2 Key metrics distributions: 7
    2.3.3 Carrier-to-Interferer (C/I) matrices: 7
    3 Preparation: 8
    3.1 REQUESTS FROM OPERATOR : 8
    3.2 ******** RESPONSIBILITIES: 8
    3.3 GENERAL PREPARATION : 8
    4 Data Collection: 9
    4.1 PM STATISTICS AND NETWORK CONFIGURATION DATA: 9
    4.2 EVENT LOGS: 9
    4.3 DATA FOR IOS: 9
    5 Data Analysis: 10
    6 Typical Optimisation Plan : 11
    Appendix A: Sample OPL Connectivity 12
    Appendix B: Sample Neighbor Topology 13
    7 Appendix C: Sample Key Metrics 14
    8 Appendix D: Sample C/I Matrix fragment(co-channel) 15
    Example C/I Matrix fragment (adjacent channel) 16


    password:123456

    thanx+reps appreciated

    br
    Attached Files Attached Files

  2. # ADS
    Circuit advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many
     

  3. #2
    Member Reputation: 1068
    Join Date
    2008-08-10
    Posts
    421


    Default Re: (IOS)Intelligent Optimisation Service_Moto..

    Quote Originally Posted by echomoon View Post
    Intelligent Optimisation Service

    Vendor:Moto...
    Network:GSM

    Intro:
    This document describes the processes and time cycles for all work
    required during the deployment of the IOS Trial in the OPERATOR network in
    COUNTRY.
    The document provides the scope of works for the trial of the Intelligent
    Optimization Service at the Operator Network. The trial region is to be defined later together with OPERATOR.

    Content:

    1 Introduction: 4
    2 The Intelligent Optimization Service(IOS) 5
    2.1 DATA COLLECTION AND TRANSPORTATION: 5
    2.2 IOS ANALYSIS PLATFORM: 6
    2.3 THE KEY DELIVERABLES OF IOS: 6
    2.3.1 Neighbor Topology: 6
    2.3.2 Key metrics distributions: 7
    2.3.3 Carrier-to-Interferer (C/I) matrices: 7
    3 Preparation: 8
    3.1 REQUESTS FROM OPERATOR : 8
    3.2 ******** RESPONSIBILITIES: 8
    3.3 GENERAL PREPARATION : 8
    4 Data Collection: 9
    4.1 PM STATISTICS AND NETWORK CONFIGURATION DATA: 9
    4.2 EVENT LOGS: 9
    4.3 DATA FOR IOS: 9
    5 Data Analysis: 10
    6 Typical Optimisation Plan : 11
    Appendix A: Sample OPL Connectivity 12
    Appendix B: Sample Neighbor Topology 13
    7 Appendix C: Sample Key Metrics 14
    8 Appendix D: Sample C/I Matrix fragment(co-channel) 15
    Example C/I Matrix fragment (adjacent channel) 16


    password:123456

    thanx+reps appreciated

    br
    do you have doc related to MVIOS??

  4. #3
    Member Reputation: 26
    Join Date
    2011-09-11
    Posts
    51


    Default Re: (IOS)Intelligent Optimisation Service_Moto..

    Successful IOS require freezing of the Network either entirely (if you want to run IOS at once for the whole network or in cluster - for very large network in otherwise you break the network into cluster and effect your freezing and data collection).
    To freeze the network means you donot make changes to the network especially in the area of configuration and this the Network Operator rarely has the patient to do. Most time it mitigates against successful IOS.
    Last edited by daweho; 2011-11-04 at 05:53 PM

  5. #4
    Member Reputation: 26
    Join Date
    2011-09-11
    Posts
    51


    Default Re: (IOS)Intelligent Optimisation Service_Moto..

    Just got this from my archives will look out for more!........needs repute!!
    Attached Files Attached Files

  6. #5
    VIP Member Reputation: 1478
    Join Date
    2011-01-01
    Location
    Earth
    Posts
    652


    Default Re: (IOS)Intelligent Optimisation Service_Moto..

    @MINTO,sorry i dont


    br

  7. #6
    Member Reputation: 49
    Join Date
    2011-10-13
    Posts
    18


    Default Re: (IOS)Intelligent Optimisation Service_Moto..

    echomoon plz send me ios doc,iam asking u alot i know,i added few thanks


    thanks dude

  8. #7
    VIP Member Reputation: 1478
    Join Date
    2011-01-01
    Location
    Earth
    Posts
    652


    Default Re: (IOS)Intelligent Optimisation Service_Moto..

    Quote Originally Posted by fahid_79 View Post
    echomoon plz send me ios doc,iam asking u alot i know,i added few thanks


    thanks dude
    no problem.....check ur safe

    br

Bookmarks

Bookmarks

Posting Rules

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •