Thanks Thanks:  0
Showing results 1 to 1 of 1

Thread: IRAT HO and Reselection Guideline

  1. #1
    Member Reputation: 44
    Join Date
    2010-09-03
    Posts
    43


    Default IRAT HO and Reselection Guideline

    THEORY
    2.1 BACKGROUND TO IRAT HO/CR
    2.2 CPICH RSCP
    2.3 CPICH EC/NO
    2.4 UPLINK AND DOWNLINK
    2.5 IRAT HANDOVER
    2.5.1 U2G: Triggering of 2G measurements
    2.5.2 U2G: Compressed mode measurements
    2.5.3 U2G: Handover from UTRAN
    2.5.4 G2U: Triggering of 3G measurements
    2.5.5 IRAT Handover strategy and possible parameter settings
    2.6 IRAT CELL RESELECTION
    2.6.1 U2G: Triggering of measurements
    2.6.2 U2G: Cell ranking
    2.6.3 G2U: measurements
    2.6.4 G2U: Cell Ranking
    2.6.5 IRAT cell reselection strategy and possible parameter settings
    2.7 SIZE OF NEIGHBOUR LIST
    2.8 PERFORMANCE INDICATORS
    2.8.1 IRAT HO Success Rate (U2G)
    2.8.2 IRAT HO Success Rate (G2U)
    2.8.3 Cell reselection outage time U2G
    2.8.4 Cell reselection outage time G2U

    Link down:
    59387576-58528996-IRAT-HO-and-Re-Selection-Tuning-SA.rar - 4shared.com - online file sharing and storage - download

  2. # ADS
    Circuit advertisement
    Join Date
    Always
    Posts
    Many
     

Bookmarks

Bookmarks

Posting Rules

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •