Thanks Thanks:  1
Showing results 1 to 9 of 9

Thread: Very Early Assignment

  1. #1
    Member Reputation: 63
    Join Date
    2010-07-15
    Posts
    126


    Default Very Early Assignment

    Hi,

    Some of you already used Very Early Assignment?

    I have high Location updates after SWAP, because new LAC is created on swapped sites (Siemens to Huawei).

    I am thinking that I can live with SD congestion if it concern LA updates only -> MSs will succeed soon or later.

    However, I want to avoid blocking on MOC and MTC. For that, I would like to use Very Early Assignment.


    Any experience to be shared here? What do you advise me?

    Thanks a lot !

  2. # ADS
    Circuit advertisement
    Join Date
    Always
    Posts
    Many
     

  3. #2
    Member Reputation: 163
    Join Date
    2011-03-26
    Posts
    85


    Default Re: Very Early Assignment

    Quote Originally Posted by kyokuman View Post
    Hi,

    Some of you already used Very Early Assignment?

    I have high Location updates after SWAP, because new LAC is created on swapped sites (Siemens to Huawei).

    I am thinking that I can live with SD congestion if it concern LA updates only -> MSs will succeed soon or later.

    However, I want to avoid blocking on MOC and MTC. For that, I would like to use Very Early Assignment.


    Any experience to be shared here? What do you advise me?

    Thanks a lot !
    this is for speed up call setup time then increasing call success rate but remember maybe some cases make some problem with connect no voice

  4. #3
    Member Reputation: 63
    Join Date
    2010-07-15
    Posts
    126


    Default Re: Very Early Assignment

    Thanks!

    However, here are clarifications about what I need to know :

    1. Does it work with MTC, or MOC only? What about sms, imsi attach/detach...

    2. Anybody is using it, and please share your experience.

    3. Can it solve call blocking if I have SDCCH busy due to high LA updates?

    4. Any other proposition to avoid bad user perception at LAC borders?

    Thanks again

  5. #4
    Senior Member Reputation: 502
    Join Date
    2008-11-05
    Posts
    1,025


    Default Re: Very Early Assignment

    Quote Originally Posted by kyokuman View Post
    Hi,

    Some of you already used Very Early Assignment?

    I have high Location updates after SWAP, because new LAC is created on swapped sites (Siemens to Huawei).

    I am thinking that I can live with SD congestion if it concern LA updates only -> MSs will succeed soon or later.

    However, I want to avoid blocking on MOC and MTC. For that, I would like to use Very Early Assignment.


    Any experience to be shared here? What do you advise me?

    Thanks a lot !

    Now what is your assignment ?

    BR
    RF engineer

  6. #5
    Member Reputation: 63
    Join Date
    2010-07-15
    Posts
    126


    Default Re: Very Early Assignment

    Now I use what everybody uses. I think it is Early assignment.


    Any info about Very Early assignment?

  7. #6
    VIP Member Reputation: 1118
    Join Date
    2011-01-26
    Posts
    1,075


    Default Re: Very Early Assignment

    Both in MTC and MOC

    Mobile-Originating Call (MOC) establishment : Very Early Assignment could take The network makes an immediate assignment to the TCH+FACCH in the initial RR establishment and performs the entire transaction on the FACCH. The SDCCH is not used. Because immediate assignment starts the FACCH in a signaling-only mode, the network must send the RR Channel Mode Modify message at some point to enable the TCH part of the channel.

    Mobile-Terminating Call (MTC) establishment : As in the MOC, the TCH+FACCH assignment can happen at any time, with the three common techniques being early, late and very early assignment
    Measurement Point of Successful TCH Seizures Measurement point of

    Successful TCH seizures Upon BSC’s reception of CHANNEL ACTIVATION ACKNOWLEDGE message from BTS in very early assignment TCH process. In the case the target cell of directed retry is located in other BSC and directed retry succeeds, MSC sends CLEAR COMMAND message to the originating BSC to release the original connection. This item is measured when the originating BSC receives this message. In the case the directed retry target cell is located in the same BSC and the directed retry succeeds, target cell sends Inter Clear Request message to the source cell to request to release the resource and the original connection. This item is measured when the source cell receives this message.

    Improving Successful TCH Seizure – Very early assignment process MS BTS BSC MSC Channel Request (RACH) Channel Required Channel Activation (TCH or SDCCH) Channel Activation Acknowledge Immediate Assignment Command Immediate Assignment
    Attached Images Attached Images
    Last edited by adewijaya; 2011-07-13 at 09:14 PM
    If this document usefull, then giving some reputations is highly appreciated.

    note : see default password

  8. #7
    Senior Member Reputation: 502
    Join Date
    2008-11-05
    Posts
    1,025


    Default Re: Very Early Assignment

    Quote Originally Posted by kyokuman View Post
    Now I use what everybody uses. I think it is Early assignment.


    Any info about Very Early assignment?
    No some one use very early assignment

    check the doc hope help u

    BR
    Attached Files Attached Files
    RF engineer

  9. #8
    VIP Member Reputation: 1118
    Join Date
    2011-01-26
    Posts
    1,075


    Default Re: Very Early Assignment

    Quote Originally Posted by RF engineer View Post
    No some one use very early assignment

    check the doc hope help u

    BR
    did you have on .ppt file? the information not completed after creating to .pdf file. So what's the conclusion? roll out or not? From some overview this feature avoid tch seizure that make blocking site
    If this document usefull, then giving some reputations is highly appreciated.

    note : see default password

  10. #9
    Senior Member Reputation: 502
    Join Date
    2008-11-05
    Posts
    1,025


    Default Re: Very Early Assignment

    Quote Originally Posted by adewijaya View Post
    did you have on .ppt file? the information not completed after creating to .pdf file. So what's the conclusion? roll out or not? From some overview this feature avoid tch seizure that make blocking site
    Dear

    Attach is the PPT for conclusion it depend you can have trial and see which one is better as different network have different traffic model.


    BR
    Attached Files Attached Files
    RF engineer

Bookmarks

Bookmarks

Posting Rules

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •