Here we are
Enjoy the attached
Type: Posts; User: mon3em; Keyword(s):
Here we are
Enjoy the attached
We did this before by planning the PCI for our blanket low band carrier (L800), assuring that we have this carrier deployed on each eNB .
Then we allocated the planned-PCI manually for all cells...
Sudan NOT South Sudan :D
Thanks for support bro
Hello Dmitry
Pleasae share the same for Sudan (if applicable)
//Thanks
It is randomly selcted busy hour samples
HWR
check the attached sample
//mon3em
different version are having different guide
Im using the calcuation guide for V100R016C10 with no problem
Sum the counter for all cells under the eNB & clculate it with the allocated QTY of the...
Mentor for LTE Presentation as Attached
Pleasae re-upload if applicaple
//Thanks
Unfortienately no working MED till now
Long time a go
But let me check in my archive
//Rgds
Parameters for Volte UL Scheduling OPT
Parameters for Latency improvement in LTE
Any one having working FMA 18 or higher !!
//Thanks
Thanks Kentck86 for your great support here .
Im wondering that, updated 2023 stuff will be arriving by now
//Thanks
What you'll learn
Optimization of LTE Drop Call on Nokia Equipment
Define LTE drop call and retain-ability.
Describe LTE E-RAB normal and Abnormal Release procedures, counters and KPIs.
Define...
What you'll learn
Optimization of LTE Drop Call on Nokia Equipment
Define LTE drop call and retain-ability.
Describe LTE E-RAB normal and Abnormal Release procedures, counters and KPIs.
Define...
What you'll learn
Optimization of LTE Drop Call on Nokia Equipment
Define LTE drop call and retain-ability.
Describe LTE E-RAB normal and Abnormal Release procedures, counters and KPIs.
Define...
5G networks Planning, Design & Optimization
by Christofer Larsson
https://www.4shared.com/s/fiH-kG7O0jq
Here is LTE-FMA v18 as below link
https://workupload.com/file/fEcsrWtrMVs
Default Password : Fine@Topix@wWw
Revision history
Here is a parameters group to improve HO performance .
Thanks for clicking THANKS :)
Default Password : Fine@Topix@wWw
Find attached helpful group of parameters to improve CQI :)
Attached is an optimization case & ideas to improve CQI
//Seth
Gents
Thanks to support with 2023 update on this (if any)
// Thanks :)
1. RBS 6000 rollout, duration: now till end of Q1 2012(Taiwan)
Needs:
- 4 x RBS6000 troubleshooting engineers
Support in initial troubleshooting of RBS6000 immediately after new...