PDA

View Full Version : RRC Reestablished process from the sudden outtage serving cell



RFNuttapon
2018-07-16, 12:42 PM
Hi all Due we have observed the eRAB drop rate is increased after the cell is shutdown from power saving plus the reestablish RRC fail time increased. So i have wondered if the UE still be able to do re-establishment for such a case after outage period?

In the normal flow after UE is RACH to the cell B (After previous cell is off) and Reest request to cell B(MSG3) Cell A need to send HO req to cell B but this case, for cell A signal is completely outage.