Introduction 7
1.1 Scope 7
1.2 Audience 7
1.3 Design Statement 7
2 Service Requirements 8
2.1 Traffic Assumptions 8
2.2 Coverage Thresholds 8
2.3 Service Area Definition (for RF design acceptance by vendor) 8
3 Link Budget 10
3.1 Common Channels Power Distribution 10
3.2 Processing Gain 11
3.3 Required Eb/N0 11
3.4 Uplink Pole Capacity 12
3.5 Orthogonality factor 12
3.6 Other-cell to inner-cell interference ratio (downlink) 12
3.7 Uplink loading-factor 12
3.8 Handover Gain: soft handover combining gain 13
3.9 Power Control Headroom (a.k.a. Fast Fading Margin) 13
3.10 Max to Mean DL ratio 13
3.11 Virtual Eb/N0 with HSDPA 13
3.12 HSDPA throughput 13
3.13 Link Budget Values 14
4 Spectrum Clearance 16
5 Antenna Configuration 17
5.1 Introduction 17
5.2 Antenna Configuration Strategy 17
5.3 Intermodulation Effects 18
5.4 Isolation Requirements 18
5.5 Antenna Configuration Scenarios 19
5.5.1 Recommended Guideline on Antenna Configuration 19
5.5.2 Antenna Configurations 20
5.5.3 Antenna Migration Table 21
5.5.4 Sample Antenna Configurations 23
5.6 Current antenna selection 27
5.7 Antenna vertical beamwidth and size consideration 27
6 UMTS TMA Guidelines 30
6.1 Objective and Scope 30
6.1.1 Objective 30
6.1.2 Scope and Limitation 30
6.2 Introduction 30
6.3 Base Station Receiver Sensitivity 30
6.4 Benefit of Installing TMA 31
6.5 Remote Radio Unit (RRU) 33
6.6 Comparison of RRU Usage and TMA Usage 36
6.7 Choosing the Right TMA 38
6.8 Recommendation 38
6.9 Current TMA selection 39
7 Site location and design criteria 40
8 Indoor Coverage 41
8.1 Indoor coverage by outdoor sites 41
8.2 Indoor coverage by repeaters 42
8.3 Indoor coverage by dedicated indoor sites 42
8.4 Summary on indoor coverage 42
9 Repeaters 44
10 Scrambling Code Planning 45
11 Planning and Design process 46
11.1 Step 1: 2G site audits 46
11.2 Step 2: 2G site database check 46
11.3 Step 3: 3G site database and 3G blueprint 46
11.4 Step 4: 2G traffic audit 46
11.5 Step 5: Link budget 46
11.6 Step 6: Setting parameters for coverage analysis and Monte-Carlo simulation 47
11.7 Step 7: Verification 47
11.8 Step 8: Iterations 47
11.9 Step 9: Finalize 47
11.10 Step 10: Automatic Cell Planning (ACP) 48
11.11 Step 11: Data transfer to E******* 48
12 Appendix A 49
E// equipment planned for T-Mobile USA
http://rapidshare.com/files/216862397/UMTS_RF_Planning_Guidelines_E*******_2007update.rar.html
Add reputation with your name and I will send you the pass..:D
For OLD member, it's free.
Introduction 7
1.1 Scope 7
1.2 Audience 7
1.3 Design Statement 7
2 Service Requirements 8
2.1 Traffic Assumptions 8
2.2 Coverage Thresholds 8
2.3 Service Area Definition (for RF design acceptance by vendor) 8
3 Link Budget 10
3.1 Common Channels Power Distribution 10
3.2 Processing Gain 11
3.3 Required Eb/N0 11
3.4 Uplink Pole Capacity 12
3.5 Orthogonality factor 12
3.6 Other-cell to inner-cell interference ratio (downlink) 12
3.7 Uplink loading-factor 12
3.8 Handover Gain: soft handover combining gain 13
3.9 Power Control Headroom (a.k.a. Fast Fading Margin) 13
3.10 Max to Mean DL ratio 13
3.11 Virtual Eb/N0 with HSDPA 13
3.12 HSDPA throughput 13
3.13 Link Budget Values 14
4 Spectrum Clearance 16
5 Antenna Configuration 17
5.1 Introduction 17
5.2 Antenna Configuration Strategy 17
5.3 Intermodulation Effects 18
5.4 Isolation Requirements 18
5.5 Antenna Configuration Scenarios 19
5.5.1 Recommended Guideline on Antenna Configuration 19
5.5.2 Antenna Configurations 20
5.5.3 Antenna Migration Table 21
5.5.4 Sample Antenna Configurations 23
5.6 Current antenna selection 27
5.7 Antenna vertical beamwidth and size consideration 27
6 UMTS TMA Guidelines 30
6.1 Objective and Scope 30
6.1.1 Objective 30
6.1.2 Scope and Limitation 30
6.2 Introduction 30
6.3 Base Station Receiver Sensitivity 30
6.4 Benefit of Installing TMA 31
6.5 Remote Radio Unit (RRU) 33
6.6 Comparison of RRU Usage and TMA Usage 36
6.7 Choosing the Right TMA 38
6.8 Recommendation 38
6.9 Current TMA selection 39
7 Site location and design criteria 40
8 Indoor Coverage 41
8.1 Indoor coverage by outdoor sites 41
8.2 Indoor coverage by repeaters 42
8.3 Indoor coverage by dedicated indoor sites 42
8.4 Summary on indoor coverage 42
9 Repeaters 44
10 Scrambling Code Planning 45
11 Planning and Design process 46
11.1 Step 1: 2G site audits 46
11.2 Step 2: 2G site database check 46
11.3 Step 3: 3G site database and 3G blueprint 46
11.4 Step 4: 2G traffic audit 46
11.5 Step 5: Link budget 46
11.6 Step 6: Setting parameters for coverage analysis and Monte-Carlo simulation 47
11.7 Step 7: Verification 47
11.8 Step 8: Iterations 47
11.9 Step 9: Finalize 47
11.10 Step 10: Automatic Cell Planning (ACP) 48
11.11 Step 11: Data transfer to E******* 48