Hi friends,
We are facing an inssue with MultiRab drops with good RF condtions, in NSN network.
MultiRab combination we are using is CS 12.2 + PS (HSDPA or R99), SwissQual logs with Actix Analyzer.
The strange issue is that on Drop events UE sends CellUpdate with "RLC unrecoverable error" message.
All drop events analysed so far are recorded in FACH state with the previous state been DCH.
Do you have similar experience or any hints on this issue?
Regards!
We are facing an inssue with MultiRab drops with good RF condtions, in NSN network.
MultiRab combination we are using is CS 12.2 + PS (HSDPA or R99), SwissQual logs with Actix Analyzer.
The strange issue is that on Drop events UE sends CellUpdate with "RLC unrecoverable error" message.
All drop events analysed so far are recorded in FACH state with the previous state been DCH.
Do you have similar experience or any hints on this issue?
Regards!