This document describes how to perform DTs and CQTs. The involved test items include the Ping test, FTP test, and HTTP test. The involved scenarios are as follows:
Single BS verification test
RF optimization test
Service optimization test
Acceptance test
Benchmark test.
1 Overview
2 DT and CQT
2.1 Test Preparations
2.1.1 Selecting Test Tools
2.1.2 Preparing the Test Environment
2.1.3 Collecting Network Data
2.1.4 Preparing a Test Car
2.1.5 Preparing a Test Plan
2.2 Test Items
2.2.1 Performing a Ping test
2.2.2 Testing FTP Upload
2.2.3 Testing FTP Download
2.2.4 Performing an HTTP Test
2.2.5 Performing a Wait Test
2.2.6 Performing a NetEntry Test
2.2.7 Performing a NetDisconnect Test
2.3 DT Operations
2.3.1 Operations Before a DT
2.3.2 Operations During a DT2.
3.3 Operations After a Test
2.4 CQT Operations
2.4.1 Operations Before a Test
2.4.2 Operations During a Test
2.4.3 Operations After a Test
3 Tests in Different Scenarios
3.1 Single BS Verification Test
3.2 RF Optimization Test
3.2.1 Test Procedure
3.2.2 Test Route
3.2.3 Test Method
3.3 Service Optimization Test
3.3.1 DT Items and Methods
3.3.2 CQT Items and Methods
3.4 Acceptance Test
3.4.1 Operations Before an Acceptance Test
3.4.2 Operations During an Acceptance Test
3.4.3 Operations After an Acceptance Test
3.5 Benchmark Test
3.5.1 Tests Before and After Network Migration or Optimization
3.5.2 Benchmark Tests Between Operators
3.5.3 Benchmark Tests Between Technologies
4 Summary
5 Attachment
Download @4Shared (http://www.4shared.com/archive/siFe0mD4/WiMAX-DTCQT_Test_Guide.html)
pass:echomoon
BR
echomoon
Date 2008-10-30
vendor:
26953
Doc.:Word
Total 46 pages
This document describes how to perform DTs and CQTs. The involved test items include the Ping test, FTP test, and HTTP test. The involved scenarios are as follows:
Single BS verification test
RF optimization test
Service optimization test
Acceptance test
Benchmark test.
1 Overview
2 DT and CQT
2.1 Test Preparations
2.1.1 Selecting Test Tools
2.1.2 Preparing the Test Environment
2.1.3 Collecting Network Data
2.1.4 Preparing a Test Car
2.1.5 Preparing a Test Plan
2.2 Test Items
2.2.1 Performing a Ping test
2.2.2 Testing FTP Upload
2.2.3 Testing FTP Download
2.2.4 Performing an HTTP Test
2.2.5 Performing a Wait Test
2.2.6 Performing a NetEntry Test
2.2.7 Performing a NetDisconnect Test
2.3 DT Operations
2.3.1 Operations Before a DT
2.3.2 Operations During a DT2.
3.3 Operations After a Test
2.4 CQT Operations
2.4.1 Operations Before a Test
2.4.2 Operations During a Test
2.4.3 Operations After a Test
3 Tests in Different Scenarios
3.1 Single BS Verification Test
3.2 RF Optimization Test
3.2.1 Test Procedure
3.2.2 Test Route
3.2.3 Test Method
3.3 Service Optimization Test
3.3.1 DT Items and Methods
3.3.2 CQT Items and Methods
3.4 Acceptance Test
3.4.1 Operations Before an Acceptance Test
3.4.2 Operations During an Acceptance Test
3.4.3 Operations After an Acceptance Test
3.5 Benchmark Test
3.5.1 Tests Before and After Network Migration or Optimization
3.5.2 Benchmark Tests Between Operators
3.5.3 Benchmark Tests Between Technologies