hari.vashishtha
2012-02-09, 09:11 PM
A complete CW( Continuous wave) Propagation test guideline. It is very useful for N/W Planning model for all tech(GSM/WCDMA/LTE/Wi-Max) for model planning.
If you like, pls must add rep & thanks.
RF CW PROCESS GUIDELINES
TABLE OF CONTENTS:-
1. INTRODUCTION
1.1 MEASUREMENT SURVEY EVENTS
2. EQUIPMENT REQUIREMENTS
2.1 VEHICLES
2.2 SURVEY EQUIPMENT
2.2.1 TRANSMITTER UNIT
2.2.2 TRANSMITTER ANTENNA
2.2.3 RECEIVER
2.2.4 SAMPLING DISTANCE AND TIMING REQUIREMENTS
2.2.5 RECEIVER ANTENNA
3. SITE PREPARATION
3.1 DRIVE ROUTE PLANNING
3.2 COORDINATION OF EQUIPMENT SETUP
3.3 SITE SELECTION PROCESS
4. SITE SETUP
4.1 EQUIPMENT OPERATION
4.2 EQUIPMENT INSTALLATION
4.2.1 CRANES
4.2.2 BUILDINGS
4.2.3 EXISTING TOWERS
5. PRECAUTIONS
6. DRIVE TEST
6.1 SURVEY LOG SHEETS
6.2 DRIVE SURVEY
6.3 DRIVE SURVEY PROBLEMS
6.3.1 LOST GPS
6.3.2 INAPPROPRIATE AND LOST RECEIVER SIGNALS
6.4 POST DRIVE SURVEY
7. SITE TEAR DOWN
APPENDICES:
A. EQUIPMENT VERIFICATION
If you like, pls must add rep & thanks.
RF CW PROCESS GUIDELINES
TABLE OF CONTENTS:-
1. INTRODUCTION
1.1 MEASUREMENT SURVEY EVENTS
2. EQUIPMENT REQUIREMENTS
2.1 VEHICLES
2.2 SURVEY EQUIPMENT
2.2.1 TRANSMITTER UNIT
2.2.2 TRANSMITTER ANTENNA
2.2.3 RECEIVER
2.2.4 SAMPLING DISTANCE AND TIMING REQUIREMENTS
2.2.5 RECEIVER ANTENNA
3. SITE PREPARATION
3.1 DRIVE ROUTE PLANNING
3.2 COORDINATION OF EQUIPMENT SETUP
3.3 SITE SELECTION PROCESS
4. SITE SETUP
4.1 EQUIPMENT OPERATION
4.2 EQUIPMENT INSTALLATION
4.2.1 CRANES
4.2.2 BUILDINGS
4.2.3 EXISTING TOWERS
5. PRECAUTIONS
6. DRIVE TEST
6.1 SURVEY LOG SHEETS
6.2 DRIVE SURVEY
6.3 DRIVE SURVEY PROBLEMS
6.3.1 LOST GPS
6.3.2 INAPPROPRIATE AND LOST RECEIVER SIGNALS
6.4 POST DRIVE SURVEY
7. SITE TEAR DOWN
APPENDICES:
A. EQUIPMENT VERIFICATION