PDA

View Full Version : Erlang Capacity of MSS/MGw



ash_bansal
2011-09-24, 10:43 AM
Can any suggst, how to check the installed capacity of E******* MSS/MGw in Erlangs.

Thanks in advance.

zeldalcl
2011-09-26, 03:43 PM
The parameter controlling node's erlang is in MGW.

ash_bansal
2011-09-30, 11:50 AM
which is the parameter? what is the command to see it?

haythem
2011-09-30, 05:56 PM
Hi,

The total traffic load in Erlang can be estimated by dividing the counter pmNrOfMediaStreamChannelsBusy (from the MO MgwApplication) by 2.005, i.e.:
Current Traffic Load (Erl) = pmNrOfMediaStreamChannelsBusy / 2.005

The constant 2.005 is an estimate and even though it depends slightly on the traffic model it gives a good estimation of the traffic load.

ash_bansal
2011-10-01, 11:58 AM
I want to know the installed capacity, not the used capacity.

How can I check the installed capacity in Erlang of a MSS/MGw? Pl. share if any parameter is there to check the same.

ash_bansal
2011-10-06, 03:24 PM
Can you please suggest, how to check the installed (usable) capacity.

ash_bansal
2011-10-21, 10:47 AM
How is it possible that nobody from E******* experts are able to answer this silly thing? plz help..

milan_recj
2011-10-22, 11:52 PM
login to MGW through OSS then run the following command

lhsh 000300 fro_lici_data_list

In the capacity limit parameter you will get the value in hex. Convert it.
That's your MGW installed capacity.

ash_bansal
2011-10-30, 12:34 PM
Thanks a lot milan for the reply..

Can you suggest, how to get the same for monolithic MSCs?



login to MGW through OSS then run the following command

lhsh 000300 fro_lici_data_list

In the capacity limit parameter you will get the value in hex. Convert it.
That's your MGW installed capacity.

roloramos
2011-11-03, 09:04 AM
Another way to verify is using SMO OSS Tool
SMO=Softeare Manager Organizer

Right click -> Configuration -> Manage HW and SW Inventory -> SMO

In SMO you can check all the networks elements with their HW and SW and LIcensing

In The case of the MGW you must check Licence SCC and after you must divides by 2,005


It is the maximun capacity value in Erl in the MGW