Dear All,<?xml:namespace prefix = o ns = "urn:schemas-microsoft-com:office:office" /><o:p></o:p>
<o:p> </o:p>
Can somebody explain to me what is the solution for the below problem.<o:p></o:p>
(during the drive test in the field for specific site and while we locked on the BCCH for the required sectors all the 6 sectors (900 sectors 1,2 and 3 and 1800 sectors 4,5 and 6) can be observed.<o:p></o:p>
When we make normal drive test for the same site it seems that there is only one sector is serve around 360 around the site. I mean the other sectors are not shown in the DT and no handover occurred intra cell.<o:p></o:p>
<o:p> </o:p>
<o:p> </o:p>
Thanks for usual support
Regards
Ahmed Al-Shawi<o:p></o:p>
<o:p> </o:p>
Can somebody explain to me what is the solution for the below problem.<o:p></o:p>
(during the drive test in the field for specific site and while we locked on the BCCH for the required sectors all the 6 sectors (900 sectors 1,2 and 3 and 1800 sectors 4,5 and 6) can be observed.<o:p></o:p>
When we make normal drive test for the same site it seems that there is only one sector is serve around 360 around the site. I mean the other sectors are not shown in the DT and no handover occurred intra cell.<o:p></o:p>
<o:p> </o:p>
<o:p> </o:p>
Thanks for usual support
Regards
Ahmed Al-Shawi<o:p></o:p>