Thanks Thanks:  9
Page 2 of 12 FirstFirst 1234 ... LastLast
Showing results 11 to 20 of 115

Thread: UMTS optimization by T-Mobile

  1. #11
    Member Reputation: 63
    Join Date
    2009-06-04
    Posts
    122


    Default

    hi boss
    i added reputation pls give me password

    Quote Originally Posted by simmus0300 View Post
    i have send password to all who have added my rep. and P.M. me.

  2. #12
    Member Reputation: 128
    Join Date
    2008-11-17
    Location
    j-b-p
    Posts
    188


    Default

    hi

    i've added rep. pl send the passwd.

  3. #13
    Member Reputation: 39
    Join Date
    2007-08-18
    Posts
    39


    Default

    Could you share it to rapidshare or 4shared?
    Thx!

  4. #14
    Member Reputation: 138
    Join Date
    2008-10-13
    Posts
    228


    Default

    tHANK YOU DEAR
    PLEASE SEND THE pw

  5. #15
    Member Reputation: 64
    Join Date
    2010-01-18
    Posts
    20


    Default

    Please send me the password.
    Thanked....

  6. #16
    Users Awaiting Email Confirmation Reputation: 12
    Join Date
    2010-01-20
    Posts
    15


    Default

    is it pdf or flash

  7. #17
    Member Reputation: 78
    Join Date
    2008-05-13
    Posts
    136


    Default

    I've already given u rep, please give me password in return

  8. #18
    Junior Member Reputation: 11
    Join Date
    2010-02-08
    Posts
    24


    Exclamation access

    hi
    i can't acceed to download this document

  9. #19
    Junior Member Reputation: 11
    Join Date
    2010-02-08
    Posts
    24


    Exclamation

    Quote Originally Posted by simmus0300 View Post
    For password,increase the reputation and mention your name in remarks..If it is already shared in forum,pl forgive me.
    Table of Contents
    1. Introduction 7
    1.1. Purpose & Scope 7
    1.2. Definitions for this Document 7
    2. UMTS technology in brief 10
    2.1. Architecture 11
    2.2. UTRAN Interfaces 11
    3. Phases of Network Optimization 13
    3.1. Objective 13
    3.2. Optimization / Acceptance Phases 13
    4. Cluster Optimization 14
    4.1. Objective 14
    4.2. Process Flow 15
    4.2.1. Cluster Unloaded Optimization 15
    4.2.2. Cluster Loaded Optimization 16
    4.3. Actix Spotlight Post Processing 19
    4.3.1. ACTIX Spotlight – Setup & Loading Log files 19
    4.3.1.1. Creating a Project Template 19
    4.3.1.2. Creating a Spotlight Project 23
    4.4. Log Files Analysis 26
    4.4.1. Swap Sector and SC Inconsistency Check Analysis 28
    4.4.2. Azimuth Verification 31
    4.4.3. Sector Coverage / Boomer Cell Analysis 32
    4.4.4. Coverage Analysis 32
    4.4.4.1. RSCP – DL Coverage Optimization 33
    4.4.4.2. Ec/No – Pilot Dominance Optimization 36
    4.4.4.3. UE Transmit Power – UL Coverage 39
    4.4.4.4. Downlink BLER – Quality 40
    4.4.4.5. Coverage Analysis – Deliverables 41
    4.4.5. Pilot Pollution Analysis 42
    4.4.5.1. Spotlight Cell Pollution Analysis 42
    4.4.5.2. Identifying Polluting Cells 45
    4.5. Over-Propagating Cell Identification 46
    4.5.1. Spotlight Boomer Cell Analysis 46
    4.5.2. Identifying Over-Propagating Cells 47
    4.6. UMTS Neighbor List Analysis 48
    4.6.1. Missing Neighbor Analysis 50
    4.6.2. SHO Overhead Analysis 53
    4.7. Access Failure Analysis 55
    4.7.1. Spotlight Access Failure Analysis 57
    4.7.2. Access Failure Causes 61
    4.7.2.1. RACH Access Troubleshooting 65
    4.7.2.2. RRC Setup Troubleshooting 68
    4.8. Drop Call Analysis 71
    4.8.1. Drop Call Causes 72
    4.8.2. Drop Call Analysis in Spotlight 76
    4.9. Packet Session Data Analysis 79
    4.9.1. R99 DCH Low Throughput Analysis 80
    4.9.2. Using Actix To Identify Low R99 Throughput 81
    4.9.3. Using Actix To Analyze Low R99 Throughput 87
    4.9.4. HSDPA Low Throughput Analysis 92
    4.9.5. Using Actix To Identify Low HSDPA Throughput 92
    4.9.5.1. Event Explorer 92
    4.9.5.2. Drill Down 94
    4.9.5.3. Additional Attributes 95
    4.9.6. Using Actix To Analyze Low HSDPA Throughput 101
    5. Market Level Optimization 107
    5.1. Objective 107
    5.2. Process Flow 108
    5.2.1. Market Loaded Optimization 108
    5.3. IRAT Handover Failure Analysis 110
    5.3.1. Identifying IRAT Handover Failures: 110
    5.3.2. IRAT Handover Failure Trouble Shooting Process 112
    5.3.3. Global IRAT handover failures: 114
    5.3.3.1. IRAT prerequisites: 114
    5.3.4. Cell Specific IRAT failures 115
    5.3.4.1. Preparation Phase Failure 117
    5.3.4.2. Execution phase failures. 119
    5.3.4.3. Confirmation phase failures 122
    6. Reference 123
    ]
    Attachment 5912

    Attachment 5913
    i can't doanload this doc please give me solution because i'm Junior Member i think

  10. #20
    Users Awaiting Email Confirmation Reputation: 12
    Join Date
    2010-01-20
    Posts
    15


    Default

    hi can i have the password plz

Bookmarks

Bookmarks

Posting Rules

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •