-
Procedure Adding 2nd Carrier at Site
1. Lock Cell from RNC
2. Export the Cabinet & Site file to your Laptop
3. Make a CV before start.
4. Delete the Cabinet & site and make a CV in case fail loading the scripts later.
5. Edit the scripts.
• In the Cabinet script:
1. change no of Carriers to 2
2. Change no of RU to 2.
• In the site script:
1. Change the freq Edge High & Low at branch B only.
6. Make all the necessary connection.
7. Load the “cabinet” wizards according to requirement. (5minute) if failures do a restart.
8. Load the “site” wizards according to requirement. (3minute)
• Local cell ID need to add i.e. 23344,23345,23346
9. Create CV.
10. Make sure no alarm.
NOTE:
Freq. branch A H = 21600
L = 21500
Freq. branch B H = 21350
L = 21250
-
2018-01-03 04:32 PM
# ADS
Circuit advertisement
Bookmarks