Thanks Thanks:  0
Showing results 1 to 1 of 1

Thread: Procedure Adding 2nd Carrier at Site

  1. #1
    Member Reputation: 914
    Join Date
    2009-02-21
    Location
    Mars
    Posts
    269


    Thumbs up Procedure Adding 2nd Carrier at Site

    1. Lock Cell from RNC
    2. Export the Cabinet & Site file to your Laptop
    3. Make a CV before start.
    4. Delete the Cabinet & site and make a CV in case fail loading the scripts later.
    5. Edit the scripts.
    • In the Cabinet script:
    1. change no of Carriers to 2
    2. Change no of RU to 2.
    • In the site script:
    1. Change the freq Edge High & Low at branch B only.

    6. Make all the necessary connection.
    7. Load the “cabinet” wizards according to requirement. (5minute) if failures do a restart.
    8. Load the “site” wizards according to requirement. (3minute)
    • Local cell ID need to add i.e. 23344,23345,23346
    9. Create CV.
    10. Make sure no alarm.


    NOTE:

    Freq. branch A H = 21600
    L = 21500

    Freq. branch B H = 21350
    L = 21250

  2. # ADS
    Circuit advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many
     

Tags for this Thread

Bookmarks

Bookmarks

Posting Rules

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •