Thanks Thanks:  0
Showing results 1 to 1 of 1

Thread: Indoor Network capacity Planning issues

  1. #1
    Member Reputation: 58
    Join Date
    2009-03-29
    Posts
    98


    Default Indoor Network capacity Planning issues

    Hello all
    Dear Capacity planning experts, Your suggestion are greatly helpfull.

    I have a problem regarding the Capacity planning (indoor)

    I have a three storage building, with three sites Implanted in each floor to boost the coverage inside the building, Because More users inside the building.

    1st floor = F1 = UMTS – 1800.
    2nd floor = F2 = UMTS – 800.
    3rd Floor = F3 = UMTS – 1800.

    Outside is completely 1800 and GSM. No 800 bands. And I have limitation in compressed mode channels available to me.

    Now Your Ideas are most welcome on Capacity Management.

    And please suggest me regarding this.

    1)How should I manage the calls coming inside the building from outside UMTS 1800 or GSM , Should I allow the calls incoming in building to have IFHO with UMTS – 800, or just SHO with UMTS 1800 .When I allow soft handover in 1st floor, I will face the problem in compressed mode channels with 2nd floor ( F2 – 800 ) due less availability of compressed mode channels.

    2) how should I manage the calls moving outside the building should I allow them to have IFHO or IRAT. By keeping in mind the availability of Compressed mode channels.

    Your help is greatly appreciated ,

    Thanks

    Mirza
    Last edited by mirza; 2009-06-04 at 10:30 PM Reason: Re framing sentence

  2. # ADS
    Circuit advertisement
    Join Date
    Always
    Posts
    Many
     

Bookmarks

Bookmarks

Posting Rules

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •