Hi Mihail,
Thanks, but the project has finished.
Good luck!
Type: Posts; User: litium1000; Keyword(s):
Hi Mihail,
Thanks, but the project has finished.
Good luck!
Thank you babak1349 for sharing your opinion!
I am not a recruiter, but a consultant that has biten more than he can chew. The only acceptance is my aprovall for the content of the report. The...
Hi experts,
I am looking for extra resources for a site verification project (based on OSS KPI). General UMTS KPI knowledge is required, also basic troubleshooting skills (intra/interfreq, IRAT...
You can try to offload U900 to U2100 through idle reselection (if you haven't done it by now). Prioritize reselection to 2100 Band from U900 and G900. Keep idle and connected UE's as much as possible...
- I was talking about overall CS drop call rate in U900 band
-Changing InSync/Out Sync makes no difference for PS. For sure, even with this timers, user experience will be far better than GSM. You...
I have just edited my last post with some sugestions..
It might be a good idea also not to allow inter-freq CS from U2100 to U900, and send them directly to IRAT. This could help in your scenario if...
If all U900 sites have collocated GSM900, PS IRAT HO makes no sense. U900 provides better coverage and PS user experience than G900. By allowing PS IRAT HO you will just move the drops in GSM.
Pay...