Search:

Type: Posts; User: blind shadow; Keyword(s):

Search: Search took 0.00 seconds.

  1. Re: Drive Test Engineer (TEMS) Required in China Heilongjiang (Fuyuan)

    Hi i am an RF engineer here in the philippines and I am interested to apply n china. How can I apply? Can you give me some details about the job?
  2. Replies
    8
    Views
    3,919

    Re: Link Budget

    hi sir, i cant download your file... it says, i dont have permission to download. can you please send it to my email if it is ok loveserenade26@yahoo.com thank you and god bless you always
  3. Thread: CQI

    by blind shadow
    Replies
    3
    Views
    2,608

    Re: CQI

    16 QAM has 16 phases in the quadrant as the modulation increases the phase also increases... the more the phase, the more chances of allocating data channels... data is modulated at a faster rate and...
  4. Replies
    9
    Views
    5,932

    Re: UMTS Layer 3 Messages

    In 3G (WCDMA), you dont need to master all the messages in RRC and layer 2... all you have to do is memorize the signalling protocol in the receiving end (UE)... for location updates/paging, call...
  5. Replies
    6
    Views
    3,208

    Re: Uplilnk Intereference

    in WiMAX, it has the same scenarios when we encounter external interference, the CINR decreases and the RSSI increases, the MS TX power also increases at a high rate. Band scan should be performed to...
  6. Replies
    0
    Views
    2,574

    ZXPOS WiMAX DT and Analyzer Tools

    Anybody here who already used ZXPOS CNT for WiMAX DT and CNA for post-process analysis? Can you please help me???? Thank u
Showing results 1 to 6 of 13