PDA

View Full Version : WiMAX Single Site Verification Guide



koepret
2011-05-14, 07:58 PM
WiMAX Single Site Verification Guide


1 Overview
2 Basic Flow
2.1 Workflow
2.2 Work Division
2.2.1 Single BS Verification Tasks for Engineering Personnel
2.2.2 Single BS Verification Tasks for Network Optimization Engineers
2.3 Test Preparation
2.3.1 Verifying Basic Parameters
2.3.2 Selecting Test Points
2.3.3 Selecting a Test Route
2.3.4 Precautions
2.3.5 Preparing Software and Hardware
3 Single BS Verification Test Items for Engineering Personnel
3.1 Verifying Engineering Installation
3.1.1 Checking Installation and Connection of Devices
3.1.2 Checking Antenna Installation
3.2 Verifying Quality of Signals
3.3 Troubleshooting
4 Single BS Verification Test Items for Network Optimization Engineers
4.1 Verifying Basic Services
4.1.1 Testing Network Access and TS Setup (Optional)
4.1.2 Duration of a Connection Setup over Air Interface (Optional)
4.1.3 Duration of a Service Connection Setup Originated by a Terminal (Optional)
4.1.4 Duration of a Service Connection Setup Originated by a BS (Optional)
4.1.5 Reactivation Success Ratio at the Terminal Side (Optional)
4.1.6 Reactivation Success Ratio at the Network Side (Optional)
4.1.7 Reactivation Delay at the Terminal Side (Optional)
4.1.8 Reactivation Delay at the Network Side (Optional)
4.1.9 Loopback Duration of Ping Packets (No-Load, Optional)
4.1.10 Loopback Duration of Ping Packets (50% Load, Optional)
4.1.11 VoIP Service Test (Mandatory)
4.1.12 VOD Service Test (Mandatory)
4.1.13 FTP Service Test (Mandatory)
4.1.14 Hybrid Service Test (Five Services: UGS, ERTPS, RTPS, NRTPS, and BE) (Optional, Difficult)
4.2 Downlink Coverage Distance Test (Mandatory)
4.3 Uplink Coverage Distance Test (Mandatory)
4.4 Regional Coverage Probability of a Single Sector (Optional)
4.5 Maximum Downlink Throughput of a Single Sector in Each MCS (Mandatory)
4.6 Maximum Uplink Throughput of a Single Sector in Each MCS (Mandatory)
4.7 Maximum Downlink Throughput of a Single Sector (Mandatory)
4.8 Maximum Uplink Throughput of a Single Sector (Mandatory)
4.9 Uplink Closed Loop Power Control Test (Optional)
4.10 Downlink AMC Test (Mandatory)
4.11 Uplink AMC Test (Mandatory)
4.12 Test of Intra-BS HO Delay and HO Success Ratio (Mandatory)
4.13 MIMO Antenna Test (Optional, Difficult)
4.14 Troubleshooting
5 Case Study
5.1 Network Access Problems
5.1.1 Near-Point Network Access Failure Due to Damaged RRU LNA
5.2 ZyXEL Terminal Problems
5.3 HO Problems
5.4 External Interference Problems
5.5 Data Configuration Problems
6 Summary
7 Appendix
7.1 WiMAX Engineering Parameters List
7.2 WiMAX Single BS Verification Checklist


enjoy that file

Koepret
======================
Please kindly add thanks and my reputation , if you fell useful :)


another WIMAX ebook
http://www.finetopix.com/library/18186-wimax-rf-tuning-guide.html
http://www.finetopix.com/network-planning/18134-wimax-network-performance-management-guide.html
http://www.finetopix.com/library/17952-wimax.html

dimooon11
2011-07-19, 06:00 PM
Hello!

It seems there missed appendix files:
7.1 WiMAX Engineering Parameters List
7.2 WiMAX Single BS Verification Checklist

Could you please add these files if you have?

Thank you in advance.

finedeniz
2011-08-13, 07:01 PM
password please
thanks:p

adewijaya
2011-08-13, 08:35 PM
password please
thanks:p

never learn and read the rules !